| | | | | | | | | | |
. | COMPARISON OF THE QUANTITY OF ROAD & DRAINAGE SYSTEM | | | | | | | | | |
. | ITEM | DESCRIPTION | (A) ORIGINAL PROPOSAL (TERRACE HOUSE SYSTEM) | | (B) ARKITEK M. GHAZALI PROPOSAL (HONDYCOMB SYSTEM) | | SAVING OF SYSTEM | | PERCENTAGE OF SAVING | |
. | 1 | 0.6m DRAIN WIDE | 7414.00 | m | 6690.00 | m | 724.00 | m | 9.77% | |
. | 2 | 0.9m DRAIN WIDE | 186.00 | m | 292.00 | m | -106.00 | m | -56.99% | |
. | 3 | 1.2m DRAIN WIDE | 389.00 | Nos. | 165.00 | Nos. | 224.00 | Nos. | 57.58% | |
. | 4 | 1.2 x 0.6m BOX CULV. | 176.00 | m | 132.00 | m | 44.00 | m | 25.00% | |
. | 5 | 1.2 x 0.9m BOX CULV.(BC1) | 41.00 | m | 40.00 | m | 1.00 | m | 2.44% | |
. | 6 | 1.8x1.2m BOX CULV. | 35.00 | Nos. | 24.00 | Nos. | 11.00 | Nos. | 31.43% | |
. | 7 | PREMIX ACCESS ROAD | 28798.94 | Nos. | 26667.67 | Nos. | 2131.27 | Nos. | 7.40% | |