| | | | | | | | | | . | Date | For | To | Amt | | Reconciliation | | | Do List | . | 9-Apr | Purchase | Richard Fontenrose | 5,000.00 | | Expenses paid by Rick | 11,971.01 | x | Replace extinguishers | . | 9-Apr | Flares, fire ext, cabin lights, etc. | West Marine | 178.22 | | Credit for 07 consumables | -236.00 | x | Replace Flares | . | 9-Apr | Registration | DNR | 276.00 | | Expenses paid by Earl | 0.00 | x | Replace icebox lid pull ring | . | 9-Apr | Pressure washer | Home Depot | 103.95 | | Total Expenses to divide | 11,735.01 | x | Install solar panel | . | 20-Apr | Liability Ins | Nationwide | 97.00 | | 0.50 | 5,867.51 | x | Fix/replace Running lights & Cabin Lights | . | 20-Apr | Towing Ins | BoatUS | 139.00 | | | | x | Replace Cabin curtains | . | 20-Apr | Running lights, rode bag | Bacons | 72.43 | | Expenses paid by Earl | 0.00 | x | Vberth Lights | . | 9-May | Shorepower Inlet | Marine General | 56.99 | | Payments from Earl | 1,500.00 | x | Pumpout holding tank | . | 2-Jul | Gauge light; Nonskid tape | West Marine | 9.11 | | Balance owed Rick | 4,367.51 | x | PETT toilet wag bags | . | 2-Jul | Hacksaw; Wiring; Line; Parts | ATW Hardware | 68.99 | | | | x | Masthead light | . | 2-Jul | Cabin curtains, engine tools | Kmart | 47.99 | | | | x | Rent or buy Powerwasher | . | 5-Oct | Haul / Wash / Launch | Casa Rio | 503.50 | | | | x | Powerwash inside & outside | . | 19-Jan | Survey | Hartoft | 250.00 | | | | x | Towing insurance | . | 19-Jan | Winter storage | Casa Rio | 250.00 | | | | x | Liability insurance | . | 21-Jan | Service | Casa Rio | 211.75 | | | | x | Toolkit / hacksaw / firstaid | . | 5-Feb | Repair sail cover | Marty's | 65.00 | | | | x | Replace shore power inlet | . | 28-Feb | Sand bottom / bottom paint | Casa Rio | 587.25 | | | | x | Dock lines | . | 28-Feb | Lettering to rename | Speedy Signs | 43.50 | | | | x | Secure companionway steps | . | 3-Mar | Batteries | Outdoor World | 148.38 | | | | x | Replace anti-skid |
|
| | | | | | | | | | . | 10-Mar | Depth finder | West Marine | 158.99 | | | | x | Repair mailsail cover | . | 10-Mar | Bacons | Mast repair hardware | 31.37 | | | | x | Determine why jib furler jams | . | 11-Mar | Towing Ins | BoatUS | 135.00 | | | | x | September: Reserve marina | . | 16-Mar | Install depth finder | D&M Marine Repair | 367.50 | | | | x | Install head protector for head entry | . | 25-Mar | Zincs, sand & paint supply | Casa Rio | 55.52 | | | | x | Replace batteries | . | 25-Mar | Replace cutless bearing | Casa Rio | 451.46 | | | | x | Replace depth finder | . | 22-Apr | Replace impeller | Casa Rio | 175.39 | | | | | Rename | . | 24-Apr | Thermostat & Thermostat housing | Bay Shore Marine | 251.63 | | | | x | Refinish companionway hatch | . | 12-Jun | Teak cleaner / teak oil | West Marine | 39.87 | | | | x | Refinish teak | . | 16-Sep | Haul / Wash / Launch | Casa Rio | 554.00 | | | | x | Install solar power ventilation | . | 12-Dec | Winterize | Casa Rio | 223.48 | | | | | Install companionway ventilation | . | 26-Dec | Registration renewal | DRN | 24.00 | | | | | Compass light & Gauge light | . | 29-Jan | Winter storage | Casa Rio | 372.00 | | | | | ATN tacker and spinnaker sock | . | 21-May | Water pump; engine labor | Casa Rio | 1,021.74 | | | | | Rig spinnaker | . | | | | | | | | | ATN topclimber? | . | | | Expenses paid by Rick | 11,971.01 | | | | | Fix head door | . | | | Cash paid to partner | 0.00 | | | | | | . | | | | | | | | | Oxidation of gelcoat | . | Date | For | To | Amt | | | | x | Sand bottom - removed old paint | . | | | | | | | | | |
|
| | | | | | | | | | . | | | | | | | | | Oxidation of gelcoat | . | | | | | | | | | Gelcoat cracking | . | | | | | | | | | Cracked by port aft house corner | . | | | | | | | | | Moisture pentration - stancion base - port gate aft stanchion | . | | | | | | | | | Core deterioration - port aft & forward chainplate | . | | | | | | | | | Moisture pentration - port chainplates | . | | | | | | | | | Moisture pentration - cabin top handrails | . | | | | | | | | | 1 sq ft diameter void, forward of tiller in cockpit sole | . | | | | | | | | | Begininng of corrosion under vinyl in lifelines | . | | | | | | | | | Cockpit locker lids need to be secured when open | . | | | Expenses paid by Earl | 0.00 | | | | | Corrosion: lower swaged fittings/turbuckles under vinyl | . | Earl to pay Rick $200 / month beginning in the fall, until caught up | | | | | | | | Leakage from handholds | . | | | | | | | | | Add slow-blow fuses to cables near batteries | . | Consumables | | Credit 07 Liability Ins | 97.00 | | | | | On/off positions need marking for switches | . | | | Credit 07 Towing | 139.00 | | | | | Protect engine from contents in cockpit lockers | . | | | | | | | | | Corrosion on gear shift cable | . | | | | 236.00 | | | | | Exhaust system connection needs double clamp | . | | | | | | | | | | . | | | | | | | | | | . | Date | Cash Payments from Earl | Amt | | | | | | |
|
| | | | | | | | | | . | 10-Mar | Check | 300.00 | | | | | | | . | 31-May | Check | 600.00 | | | | | | | . | 21-Aug | Check | 600.00 | | | | | | | . | | | | | | | | | | . | | | | | | With some cosmetic attention to details, the vessel could be made to look very nice. | | | | . | | | | | | Structurally, the vessel was in need of some attention to the core | | | | . | | | | | | along the handrails and in a few areas in the port side deck | | | | . | | | | | | where moisture has penetrated and caused core deterioration. | | | | . | | | | | | Some small attention to the system installations was also needed. | | | | . | | | | | | | | | | . | | | | | | | | | | . | | | | | | | | | | . | | | | | | | | | | . | | | | | | | | | | . | | | | | | | | | | . | | | | | | | | | | . | | | | | | | | | | . | | | | | | | | | | . | | | | | | | | | | . | | | | | | | | | |
|
| | | | | | | | | | . | | | | | | | | | | . | | | | | | | | | | . | | | | | | | | | | . | | Payments to Rick from Earl | 1,500.00 | | | | | | | . | | | | | | | | | |
|