PHOIOL: 5th Floor Integrated Optics Lab Equipment Maintenance Downtime Log

.

.

Color Code DefinitionsDOWN - Equipment not usable

.

UP - Equipment is operational

.

Partially Operational - Equipment may be usable contact Lab Manager

.

.

DateEquipmentStatusFollow on NotesSystem Update

.

09/27/07House VacuumDOWNOil Filter Change on Vacuum PumpStandard Maintenance

.

09/28/07House VacuumUPPM CompleteMaintenance Complete

.

10/11/07FC150DOWNTechnician from Suss Micro-tech will be performing standard PM on the system Thursday and FridayStandard Maintenance

.

10/15/07FC150UPPM CompleteMaintenance Complete

.

12/17/07 - 12/19/07FC150DOWNThermal controllers are blinking, recalibration procedure did not work - service contacted and coming in on Thursday December 20thService in process

.

12/20/07FC150UPService CompleteService Complete

.

03/05/08FC150DOWNCoupler needs to be replaced on motor.Service Call Completed

.

03/11/08FC150DOWNCoupler will be replaced on Wednesday 3/12/08.Service in process

.

03/12/08FC150DOWNWe had the wrong part needed. The correct part is on order. Not sure on the lead time yet.Parts on Order

.

03/14/08FC150UPCoupling part replacement complete.Service Complete

.

09/17/08plasma cleanerDOWNDoes not seem to be working.Service in process

.

09/20/08plasma cleanerUPFixed hose connection.Service Complete

.

10/27/08FC150DOWNGetting multiple errors.Service Call Completed

.

10/31/08FC150DOWNService will be arriving Tuesday, 11-4-08. Should be up and running soon after.Service in process

.

11/04/08FC150DOWNWaiting for temp controller to be fixed and finish PM. Equipment will be down for up to 2 weeks.Part Being Fixed

.

11/19/08FC150UPTemp controller has been fixed and put back into the system. Will get PM in a few weeks.Service Complete

.

01/17/09Bruker FTIRDOWNService has been called and will arrive on Wednesday, 1-22-09Service in process

.

01/26/09Bruker FTIRUPThe alignment has been done. FTIR is back up and running.Service Complete

.

08/28/09Varian Cary 5000DOWNChopper needs to be replaced. Parts on order. Back up in 2 weeks.Parts on Order

.

09/09/09Varian Cary 5000UPChopper was replaced. It is back up and running.Service Complete

.

.